The ITER diagnostic systems include a Lost Alpha Monitor using a reciprocating Fast Ion Loss Detector located in ITER Diagnostic Equatorial Port #8 (EP8) to measure the energy and flux of fast ions during the tokamak pulse.

According to the project schedule, the development work of this Lost Alpha Monitor shall start from 2023.

The scope of work covers conceptual design, preliminary design, final design and preparation of the manufacturing technical specifications and the associated drawings, prototyping and tests.

The relevant documents:

Attachment-Technical_Description_-_Lost_Alpha_Monitor_PR10024281.pdf

Communications_with_DA_on_Lost_Alpha_Monitor_Development_PR10024281.pdf